Scores, rules and test day
How EEI Test Scores Work: Index Scales Explained
EEI batteries report an index score, not a percentage: 1 to 10 for CAST, zero to 15 for POSS. Why no cut score is published, and what employers see.
Published · 5 min read
EEI batteries do not report a percentage. They report an index score, and the scale is different for each battery: 1 to 10 for CAST and CAST-R, zero to 15 for POSS, a single combined index with no published range for MASS and TECH, and a plain verdict of "Recommended" or "Not Recommended" for SO/PD II. That index goes to the employer, not to you, and no employer publishes the level at which it hires.
What an index score is
Your raw answers on each test are converted to component scores, and those are combined into one number. The brochures describe what that number is for in terms of probability: MASS's says the index is translated into expected probabilities of successful job performance, and POSS's uses the same framing. The index is a prediction about job performance, not a mark out of ten.
That has a practical consequence. A CAST index of 7 does not mean you got 70% of the questions right, and a POSS index of 9 is not comparable to a CAST index of 9 — the scales are different lengths and are built from different tests. Comparing index numbers across batteries is meaningless, and a surprising amount of what circulates online does exactly that.
The scales, battery by battery
| Battery | How it is reported |
|---|---|
| CAST | Single index score, 1 to 10 |
| CAST-R | Index score, 1 to 10 |
| POSS | Aptitude index score, zero to 15 |
| MASS | One combined index score — no numeric range published |
| TECH | An overall score predicting likelihood of success — no numeric range published |
| SO/PD II | "Recommended" or "Not Recommended" — no index at all |
The blanks in that table are as informative as the entries. EEI's MASS and TECH brochures describe a combined index and an overall score without ever giving a range, across more than one document vintage. If you find a site quoting a range for either, it did not come from a brochure.
Why nobody publishes the level you need
This is the question everyone asks, and the honest answer is that there is no public figure to give — not because it is secret in some sinister way, but because there is no single number to publish.
EEI's CAST brochure explains why, without ever naming a number. The battery was designed with administrative flexibility in mind, and it does not set a threshold: "cutoff scores on the CAST battery can be tailored to local company employment needs." Each utility decides for itself, for each job, and treats the result as internal. Southern California Edison is unusually direct about it in its own testing FAQ: it tells candidates that it does not provide cut-off scores and provides pass or fail results only, and that a candidate will not receive an actual numeric score or information about confidential cut-off levels. Arkansas Electric Cooperative Corporation likewise refers to a cut-off score in its process without ever naming a value.
So when you see a confident claim that "most utilities cut at X, aim for Y", understand what it is: somebody's guess, repeated. We are not going to repeat it, and you should discount any site that does — if they will invent that, consider what else they have invented.
What you will and will not be told
EEI does not give results to applicants. Its public page directs applicants to the employer for anything to do with testing and says EEI does not administer its employment tests to applicants directly. So your result reaches you through the utility, in whatever form that utility chooses — which for some employers is pass or fail and nothing more.
Turnaround varies widely and is worth asking about rather than guessing at. Entergy says results are typically available within five business days; Southern California Edison says five to seven; Southern Company says delivery should not exceed three weeks in most cases; Arkansas Electric Cooperative says results are available immediately when the test is taken on-site with its own administrator.
No penalty for guessing
One scoring rule is consistent and useful: EEI's brochures for CAST-R, POSS and MASS all state that there is no penalty for guessing or wrong answers. Your score is built from correct answers, so a blank and a wrong answer cost the same.
That converts directly into strategy. On the tightest sections — 44 mechanical questions in 20 minutes, 18 math questions in 7 — you should plan to spend the last fifteen seconds marking every unanswered item. Practice that ending, because doing it calmly under a real clock is a skill. Our Mechanical Concepts demo runs at the real pace so you can rehearse it.
How to use a score you cannot see
Since you will not get a numeric result and could not benchmark it if you did, the only sensible target is your own performance under time. That is measurable: how many of 44 mechanical questions you complete accurately in 20 minutes, whether you finish the math sprint, how many reading questions you leave blank. Those numbers move with practice, and they are the ones you control. Full battery practice reports them section by section, and access is one payment.
Frequently asked questions
What is a good score on the EEI CAST test?
There is no published answer. The battery reports an index from 1 to 10, EEI says cutoffs are tailored to each company's needs, and no utility publishes the level it hires at. Anyone quoting a specific number is guessing.
Will I be told my index score?
Not necessarily. EEI does not give results to applicants, so it depends on the employer — and at least one large utility states that candidates receive pass or fail only, with no numeric figure.
Why do the batteries use different scales?
They were developed at different times by different research teams for different jobs. CAST came from a 34-company consortium project, POSS from a 70-company one, and each was scaled independently. There is no conversion between them.
Does the Work Preferences Inventory affect the index?
CAST-R reports a single index built from its components, and EEI does not publish how the inventory is weighted within it. See our guide to that section.
Try the practice sections
Original questions written from the published descriptions of these batteries — for familiarization and repetition. Not real test content, not identical to any real test, and no promise about any result.
Sources
- CAST — Construction and Skilled Trades Selection System (test brochure) — Edison Electric Institute, published by LG&E and KU. Accessed September 16, 2026. EEI brochure, © 2009, self-hosted by the utility.
- POSS — Plant Operator Selection System (test brochure) — Edison Electric Institute, published by LG&E and KU. Accessed September 16, 2026. EEI brochure, © 2001, revised October 2015.
- MASS — Plant Maintenance Positions Selection System (test brochure) — Edison Electric Institute, published by LG&E and KU. Accessed September 16, 2026. EEI brochure, © 2001, updated October 2015.
- TECH — Technician Occupations Selection System (test brochure) — Edison Electric Institute, published by LG&E and KU. Accessed September 16, 2026. EEI brochure, © 2009.
- SO/PD II — System Operator / Power Dispatching Selection System (test brochure) — Edison Electric Institute, published by LG&E and KU. Accessed September 16, 2026. EEI brochure, © 2015.
- SCE Testing FAQ (retest policy, score validity, prohibited items) — Southern California Edison. Accessed September 16, 2026.
- Industry Training and the EEI Employment Testing Consortium — Edison Electric Institute. Accessed September 16, 2026.
Utility Tests is an independent practice and familiarization resource. We are not affiliated with, endorsed by, sponsored by, or connected to the Edison Electric Institute (EEI), any EEI member company, or any electric utility, contractor or test administrator. "EEI", "CAST", "CAST-R", "POSS" and "MASS" are used only to describe the employment tests our material helps you get familiar with, and all trademarks are the property of their respective owners. Every question, drawing, passage and statement here is original work, written from publicly published descriptions of those tests; it is not real test content and is not identical to any real test. No employer publishes a cut score or pass mark for an EEI battery — cutoff scores are set locally by each employer — so nothing here tells you what score you need, and practicing here does not guarantee any score, index, interview or job offer.
Hiring rules, testing policies and pay change. Confirm anything that matters with the employer running your application before you act on it.